Preserve Performance Before the First Nail 

ICON® is engineered to deliver long-lasting durability and visual appeal, but proper storage and handling are key to ensuring it performs as intended from the moment it arrives on site. 

Montauk-cropped

Store Smart 

  • Keep ICON® boards protected in a shaded, dry area before installation.

  • Stack materials flat on evenly spaced dunnage, a minimum of 12 inches off the ground, to allow airflow and prevent moisture absorption.

  • Protect from direct sunlight and weather exposure, which can cause premature surface color changes.

  • If stored outside, ICON® must be covered with a tarp to protect it from moisture and UV rays. 

Handle with Care 

  • Avoid dragging or dropping boards to maintain edge integrity and surface finish.
  • Please make sure to keep boards clean and free of debris to prevent discoloration of the material
Timber Trading - 20 Madbury Ln2(Web)
Timber Trading - 20 Madbury Ln13(Web)

Acclimate Before Installing 

Before fastening ICON® to any structure, allow it to acclimate on-site for at least 72 hours. This ensures the wood adjusts to local conditions—temperature, humidity, and airflow—helping prevent unnecessary movement and improving long-term performance.